What we do

Solar Power Plants

From rooftops to open fields, farmland to car parks — we design your plant, run its permits, build and operate it. Zoning, EIA and licensing included, end to end.

Get a free survey

Four ways to build

  • Rooftop PV

    Self-consumption on home and business roofs: cuts the bill at its source.

  • Ground-Mount PV (Unlicensed)

    1–5 MW unlicensed generation: turns idle land into income.

  • Agri-PV

    Generation and farming on the same parcel: the sun covers irrigation loads.

  • Carport PV

    Parking shade becomes a power plant; a natural pair with EV charging.

  • Homes

    Turnkey rooftop PV for villas and detached homes — net metering and up to 90% bill savings. Full flow: the For Home page.

  • Commercial & Industrial

    Factories, warehouses, malls and agri businesses: lower OPEX, accelerated depreciation, corporate PPA options.

The equipment we field

Panel & inverter catalog
  • Who runs the permits and licensing?

    We do. Zoning status, EIA exemption or application, call letter and connection agreement — every project-development step is in scope.

  • How long does installation take?

    Rooftop systems typically run 4–8 weeks from survey to commissioning; unlicensed ground projects take 3–6 months depending on the permit calendar.

Ready?

Invest in your energy future today

Create a free survey and we'll bring you a tailored savings and system proposal.