Six steps from survey to operation
We bring your project to life in six transparent steps, from the first idea to long-term operation.
Free Survey
We inspect the site in person and analyze your bills and load profile. The survey is free.
System Design
We model monthly and annual production with PVsyst or PV*SOL and size the battery capacity to your consumption profile.
Permits and Approval
We run the entire official process, including the utility application, the connection invitation letter and the connection agreement.
Procurement
We source every component, from panels to batteries, from tier-1 manufacturers. The equipment list is written into the offer by brand and model.
Installation
We complete the installation, run the tests and bring the system online. The work area is contained and the site is tidied at the end of every day.
Monitoring and Maintenance
We monitor the system remotely around the clock, carry out periodic maintenance and send you performance reports.

Ready?
Let's plan the energy transformation that starts on your roof
From solar and storage to EV charging and climate control, let's design the right system for your needs.
